Header

Home » FIS

Furnace Improvements (FIS) was employed to supply a new Hot Oil Heater (HT-501) for a plant.
FIS executed the following activities:

  • Heater Process
  • Mechanical Design
  • Structural Analysis
  • Material Procurement and Supply
  • Field Installation of the Hot Oil Heater
  • Piping
  • Instrumentation
  • Foundation  

FIS supplied the burner management system and procured all the instrumentation controls of the heater.

This hot oil heater is designed for a heat duty of 25.0 MMBtu/hr. The heater has an efficiency of 85.3%.

The total duration of this project from start to end was 12 months. This heater was successfully commissioned in August 2007.

 

Hot Oil Heater

SharePoint E-Mail

Copyright © 2009
1600 Highway 6 Ste. 480, Sugar Land, Texas. 77478 U.S.A. Tel. (281)-980-0325 Fax. (832)-886-1665